英语口语测试试题及答案

2022-08-17 11:32:22   第一文档网     [ 字体: ] [ 阅读: ] [ 文档下载 ]

#第一文档网# 导语】以下是®第一文档网的小编为您整理的《英语口语测试试题及答案》,欢迎阅读!
英语口语,试题,答案,测试
英语口语测试试题及答案(试题)

一、词汇英翻中 1 liquidate 2 wiggle room 3 rental 4 a rough patch 5 arc lamps 6 lighthouse 7 lighting 8 illumination 9 incandescent 10 steam

二、句子中翻英 1 我现在身临绝境,我不知道我还能不能完整地从困境中走出来。 2 我真的从来没有遇到过这种情况,但是如果是我的话,我会从把一些资产变现开始。 3 我不是想教你怎么做生意,就是想说如果是我的话,我会怎么做。 4 我看看能不能卖掉一些设备,用一段时间租的。 5 我们知道你现在的情况很难,可以给你一些优惠。

三、句子英翻中

The purpose of this introductory chapter is to provide a general description of electric power systems beginning with a historical sketch of their evolution.

The performance requirements of a properly designed power system and the various levels of controls used to meet these requirements are also described.

The first complete electric power system(comprising a generator, cable, fuse, meter, and loads)was built by Thomas Edison-the historic Pearl Street Station in New York City which began operation in September 1882.

This was a DC system consisting of a steam-engine-driven DC generator supplying power to 59 customers within an area roughly 1.5 km in radius.

The load, which consisted entirely of incandescent lamps, was supplied at 110 V through an underground cable system.



1 2 3 4 5


英语口语测试试题及答案(答案)

一、词汇英翻中 liquidate wiggle room rental a rough patch arc lamps lighthouse lighting illumination incandescent steam



二、句子中翻英

我现在身临绝境,我不知道我还能不能完整地从困境中走出来。

我真的从来没有遇到过这种情况,但是如果是我的话,我会从把一些资产变现开始。

我不是想教你怎么做生意,就是想说如果是我的话,我会怎么做。

我看看能不能卖掉一些设备,用一段时间租的。 我们知道你现在的情况很难,可以给你一些优惠。



三、句子英翻中

The purpose of this introductory chapter is to provide a 本章从历史演进的简要回顾入手,对电力系统作一般描述。 general description of electric power systems beginning with a historical sketch of their evolution.

The performance requirements of a properly designed power 对通过适当设计而实现的电力系统的性能要求,以及为满system and the various levels of controls used to meet these 足这些要求在不同层次所采取的控制措施也作了介绍。 requirements are also described.

The first complete electric power system(comprising a generator, cable, fuse, meter, and loads)was built by Thomas Edison-the historic Pearl Street Station in New York City which began operation in September 1882.

第一个完整的电力系统(由发电机、电缆、熔丝、电表和负荷组成)是由托马斯爱迪生( Thomas Edison)在纽约城历史上有名的皮埃尔大街站( Pearl Street station)建成并于18829月投入运行。

I'm really up against a wall here. I don't know if I’m going to be able to get out this in one piece.

I've really never been in that kind of situation before. But if it were me, I would start by liquidating some of my assets. I'm not trying to tell you how to run your business, just what would I do if I were in your shoes.

I'll see if I can sell off this equipment and work with rentals for a while.

We know you're going through a rough patch, we can cut you a deal.

清算,清盘;变现 [商业] 回旋余地、空间

出租,租赁,租借;租金,租费 艰难时刻;困难时期;低迷期; 电弧灯 灯塔

灯光、照明设备 照明

白炽的,白热的 蒸汽,水蒸气

This was a DC system consisting of a steam-engine-driven 这是一个直流电系统,由一台蒸汽机拖动直流发电机供给DC generator supplying power to 59 customers within an area 半径约为1.5km面积内的59个用户。 roughly 1.5 km in radius.

The load, which consisted entirely of incandescent lamps, 负荷全部由白炽灯组成,通过110v地下电缆供电。 was supplied at 110 V through an underground cable system.





本文来源:https://www.dy1993.cn/QuM.html

相关推荐